Magnetic Resistance Type Rotating Transformer Installation Instruction Manual

2026-07-02

The schematic diagram of the magnetic resistance resolver structure is as follows:

(1) Pole pairs

There are mainly 2-pole, 3-pole, 4-pole, 5-pole, and 6-pole types. There is an angle multiplication relationship here, that is, electrical angle / mechanical angle = pole pairs.

(2) Conventional parameters

DC resistance, input impedance, excitation signal (voltage, frequency, current)

Note: When designing the RDC circuit, special attention should be paid to impedance matching, the waveform of the excitation signal, and the way of the output circuit; at the same time, the optimization design and assembly of electromagnetic interference and high-temperature characteristics should be carried out.


(3) Conventional incoming material inspection:

1. Does the product specification model match the drawing?

2. Appearance inspection: including packaging method, check for scratches, delamination, damage, etc.

3. DC resistance inspection: use the resistance range of the multimeter to determine if there is a broken wire or severe short-circuit fault.

4. Waveform inspection: need to power on for detection, using special fixtures or simulation methods.

5. Other non-standard indicators inspection: high and low temperature, electromagnetic interference, insulation resistance, etc.


Installation precautions

1. After opening the box:

1) Carefully check for any cracks or other defects;

2) Do not directly pull or lift the lead wires;

3) Do not handle it illegally by hitting, dropping, etc.


2. During installation:

1) Installation accuracy requirements: Ensure coaxial installation as much as possible, with a coaxiality requirement higher than 0.05mm;

2) Avoid high-concentration corrosive gas or liquid environments;

3) Avoid high-radiation environments;

4) Do not strike vigorously, especially the coil part;

5) Do not loosen screws or other components at will to avoid affecting the rotation speed performance;

6) It is necessary to cover and protect the rotor part.


3. When wiring:

1) Signal line definition: Excitation R1-R2, signal S1-S3 and S2-S4;

2) Pay attention to the color of each wire and connect them correctly.


4. Before turning on:

1) Recheck the installation and safety clearance;

2) Check if the installation tools have been removed.


5. When operating:

1) Use standard operating environmental conditions and rotation speed;

2) Do not approach or touch the rotating shaft;

3) Do not drip oil or water onto the rotation sensor;

4) If there is severe vibration or impact during operation, contact the supplier.


6. When storing:

1) Store in a constant temperature and dry environment as much as possible.


7. During maintenance:

1) Combine incoming material inspection methods, carefully observe and inspect the appearance, rotor, conductivity, insulation condition (greater than 100MΩ), etc.




share